A doggie day care facility. Time to upgrade the window assembly on the exposed side of the building from wood to aluminum products.
The dogs are corralled,…
…the tarps have been laid, the tools set-out and the materials are in place and ready for the installation to commence.
The original vertical wood mull-posts provided structural support to the header above, so they had to be replaced with steel-supports posts.
We cut and preassembled the primary components at our shop in Tigard before bringing them to the job-site. But some of the associated materials still had need to be cut to length…
…such as the sill-pan, which is the first component to be installed.
And then the jamb assemblies are put in place.
Now we’re ready for the insulated glass.
The glass is installed and the finished product as viewed from the interior.